B-Im 05 Solarpark Am Jungberg (Ilmnitz and Drackendorf)
The planning area is located in the districts of Drackendorf and Ilmnitz on the site of the former Ilmnitz domestic waste landfill.
Procedure
- Initiation decision: 02.09.2009
- Early participation, public information event: 18.08.2010
- Public display: 19.07.2010 to 27.08.2010
- Weighing up decision: 02.03.2011
- Statutory resolution: 02.03.2011
- Publication in the official gazette no. 12/11: 24.03.2011
- Entry into legal force: 25.03.2011
Plan content
The content of the plan is the designation of two special areas (SO1 and SO2) on which photovoltaic systems are to be erected.
Important note
The planning documents attached as a download are for information purposes only. Only the legally binding copy of the plan that can be viewed at the urban planning department is authoritative.