VBB-J 45 "EichplatzAreal - Baufeld A" (Jena-Zentrum)
Procedure
Application and initiation
- Application to initiate a procedure for the preparation of a development plan: 02.12.2020
- Initiation decision (resolution no. 20/0731-BV) by the city council on 17.02.2021
- Publication of the initiation resolution in the official gazette of the city of Jena no. 20/21 (PDF) on 20.05.2021
Preliminary draft of the development plan
- Local announcement of the early public information in accordance with Section 3 (1) BauGB in the official gazette of the City of Jena No. 26/21 (PDF) dated 01.07.2021
- Early public information in accordance with Section 3 (1) BauGB from 09 - 23.07.2021
- Early involvement of the authorities and other public bodies in accordance with Section 4 (1) BauGB from 09 - 23.07.2021 with letter dated 09.07.2021
Draft of the development plan
- Approval of the draft development plan and decision to lay it out (resolution no. 23/2131-BV) by the city council on 22.11.2023
- Local announcement of the publication on the Internet in the official gazette of the city of Jena no. 48/23 (PDF) of 30.11.2023
- Publication of the draft development plan on the internet in accordance with Section 3 (2) BauGB from 08.12.2023 - 18.01.2024
- Participation of the authorities and other public bodies in accordance with Section 4 (2) BauGB from 08.12.2023 - 18.01.2024 with letter dated 06.12.2023
Consideration, statutes and legal force
- Decision on consideration (resolution no. 24/2379-BV) by the city council on 24.04.2024
- Resolution on the articles of association (resolution no. 24/2380-BV) by the city council in accordance with Section 10 BauGB on 24.04.2024
- Legal force through public announcement in the official gazette of the city of Jena no. 34/24 (PDF) dated 22.08.2024
Plan content
The new development on the Eichplatz site - construction site A will be built in the area of tension between the historic city center and the high-rise buildings to the west of the site. The medieval urban layout and the small scale of the historic façades are juxtaposed with the buildings, whose architectural language and placement in the urban space at the time of their construction expressed the departure into the modern future. This framework plan creates a spatial structure that mediates between the historic city and the high-rise solitaires. The urban and architectural design largely adopts the specifications of the framework plan and develops them further in some areas.
The Eichplatz area - construction site A is conceived as part of an independent quarter whose development blends into the existing urban layout on the outside. It supports the formation of the immediately adjacent streetscapes with clear spatial edges. Inside the quarter, an independent, small-scale spatial structure is created. New and old city squares are spatially linked with one another.
Realization status
Implementation of the project has not yet begun. [As at: September 2024]
Important note
The attached planning documents are for information purposes only. Only the legally binding copy of the plan that can be viewed at the Urban Planning Department is authoritative.
Expert reports and expert opinions prepared in connection with the development plan procedure can be found in draft resolution no. 23/2131-BV. The main contents and statements from these were incorporated into the planning process.