B-Lo 05 University Hospital (Neulobeda)
Procedure
- Decision to initiate: 25.05.1994
- Statutory resolution: 21.04.2010
- Legal force through public announcement: 16.09.2010
Plan content
The content of the plan is the new construction of the Clinic for Internal Medicine of the Friedrich Schiller University Hospital. In the run-up to the planning, an urban design ideas and implementation competition was held, the results of which form the basis for the development plan. Among others, the following planning goals were formulated
- urban-architectural and functional integration of the special area of the university hospital into the urban context
- Centralisation of all clinic functions
- Insertion of a green corridor as a link for a continuous east-west green corridor from Goethepark to the Erlanger Allee connection
- Increasing the attractiveness of the area's continuity by creating new footpath and cycle path connections
In order to use land sparingly, the aim is to achieve a high level of building use and compact development on the areas that can be built on. In return, larger areas of the adjacent natural spaces are not to be built on and are to be landscaped or left to develop.
Realisation status
The clinic buildings have been erected and are in use.
Important note
The documents attached as downloads are for information purposes only. Only the legally binding copy of the plan, which can be viewed at the Urban Planning Department, is authoritative.